Concrete Patios & Driveways Johnston, SC: Larger South Carolina lots
Augusta Concrete Patios pours patios, driveways, walkways, steps and pool decks throughout
Johnston, SC. Free on-site quote, usually within two working days.
Concrete work in Johnston, SC
Access and ground conditions in Johnston, SC
On a rural property the question is rarely whether we can pour it. It is whether a loaded mixer can get to it. A concrete truck weighs upward of thirty tons full, and soft ground after rain will stop one where a pickup goes through fine.
So the route matters more than the distance. We walk it on the quoting visit, and where the approach will not take a truck we either build a temporary stone track or pump the concrete in. Both are solvable; both belong on the quote rather than on the day.
What we are asked for most here: Driveways, barn and shop pads, approach work.
Concrete Patios, a poured slab sized to the furniture and the door it serves
Concrete Driveways, a slab built for vehicle loads, not foot traffic
Concrete Walkways, a path from the street or drive to the door
Concrete Pool Decks, the surround that has to stay cool and non-slip when wet
Concrete Steps, poured risers and treads, formed on site rather than precast
Concrete Sidewalks, public-frontage walk, usually to county specification
Garage Floor Coating, a resin system over an existing slab, not new concrete
Concrete Front Porch, a raised entry slab, often replacing a failed original
Finishes
Stamped Concrete, a texture pressed into the surface while the slab is still plastic
Exposed Aggregate Concrete, stone brought to the surface by washing back the cement paste
Stained Concrete, colour driven into cured concrete rather than mixed in
Colored Concrete, pigment batched into the mix at the plant
Broom Finish Concrete, the standard textured finish, drawn with a broom across the float
Salt Finish Concrete, rock salt pressed in then washed out, leaving small pits
Polished Concrete, mechanically ground and densified, an interior finish
Concrete Overlay, a thin cementitious layer over sound existing concrete
Repair and replacement
Concrete Crack Repair, routing and filling cracks that are stable, and identifying those that are not
Concrete Resurfacing, a new wearing surface over a sound slab
Concrete Sealing, a protective coat against water, salt and staining
Concrete Leveling, lifting a settled slab back to grade instead of replacing it
Concrete Driveway Replacement, full removal and repour when repair no longer makes sense
Concrete Removal, breaking out and hauling away an existing slab
Commercial
Commercial Concrete Contractor, flatwork for businesses, HOAs and property managers
ADA Curb Ramps, compliant ramps with detectable warning panels
Concrete Parking Areas, lots and bays built for repeated vehicle loading
Dumpster Pads, a reinforced pad that survives being dropped on
Loading Dock Aprons, the heavily loaded slab in front of a dock
Commercial Concrete Patios, outdoor slabs for restaurants, offices and multifamily, sized for furniture and foot traffic
Commercial Concrete Replacement, tearing out failed flatwork and repouring it without closing the business
Permits in Edgefield County
Anything in the public right of way, the sidewalk across your frontage and the driveway apron where it meets the street, needs a permit from Edgefield County and an inspection afterwards. Work behind the property line generally does not. South Carolina work is licensed separately from Georgia, and we carry both. We check which applies before quoting.
Questions we get asked
How much does a long gravel drive cost to convert?
It is priced by the foot, and a few hundred feet is a serious number. We will say that plainly. What you are buying is the end of annual grading and stone in the grass.
Can we do part of it?
Yes, and it is often the sensible answer. The first stretch from the road and the turnaround take most of the wear and most of the mud. Pour those, leave the middle gravel, extend later.
Will a concrete truck reach the pour?
On acreage, usually, but the route matters more than the distance. Soft ground after rain will stop a loaded mixer, so we look at the approach before scheduling.